Lotus Tower
නෙළුම් කුළුණ, Colombo Lotus Tower
Tower
Completed
2019
Telecommunications / Observation
All-Concrete
350 m / 1,148 ft
7
30,600 m² / 329,376 ft²
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
13 December 2015 - Event
10 June 2014 - Event
17 September 2019
The 350-meter-tall Lotus Tower, located in the heart of Colombo city, hosted an unveiling ceremony on Monday, 16 September 2019. The project cost over US$100...
13 December 2015
CTBUH Sri Lanka hosted an important seminar for tall building professionals on “Building Envelope Design for Major Structures.”