You must be a CVU Member to view this resource.
Vehicle Assembly Building
High Bay Building
Building
Completed
1965
Industrial
All-Steel
160.3 m / 526 ft
40
You must be a CVU Member to view this resource.
Construction Start
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development